How Many Days Does It Take to Renovate a House?

How Many Days Does It Take to Renovate a House?

Renovating a house sounds exciting—until you realize you might be living with dust, noise, and strangers in your space way longer than you expected. Everyone wants to know the magic number: How many days does it actually take? The reality is there’s no single answer. One person’s simple bathroom update is another person’s six-month nightmare.

If you just need fresh paint and new flooring, you could be done in under two weeks. But if you’re tearing everything down to the studs, moving walls, or waiting on permits, you might be counting months. The real kicker? Delays happen. Rain, backordered cabinets, or a missing tile can set the whole thing back. The average full-house renovation in the U.S. takes about four to eight months—sometimes faster, sometimes a lot slower if your house is older or needs major repairs.

Surprised? Most folks are. That’s why you really can’t just trust a contractor’s “quick estimate.” You need to dig deeper into what you actually want done, what could get in the way, and how to avoid the big time-wasters that slow everything down.

The Short Answer: Timelines at a Glance

If you’re hoping for a straight-up number, here’s the basic rundown. House renovation can mean anything from swapping kitchen cabinets to gutting the place and rebuilding. Still, some averages can give you a ballpark idea.

Type of RenovationTypical Timeline
Cosmetic updates (paint, floors, fixtures)1–3 weeks
Single-room remodel (kitchen, bath)3–8 weeks
Whole house light remodel2–4 months
Full gut/structural changes4–8+ months

Some projects, like refreshing a guest bedroom, can wrap up over a couple of weekends. Kitchens and bathrooms, though, usually take longer because plumbing, cabinets, and tile work don’t happen overnight. Once you start removing walls or dealing with permits, that’s when things can drag out. Want everything done at once? Be ready for the longer end of the spectrum.

Here are a few things that almost always speed things up:

  • Working with experienced, organized contractors
  • Ordering all materials before work starts
  • Staying on top of decisions and avoiding last-minute changes

On the flip side, the biggest time drains are waiting on custom products, permit delays, and bad surprises hiding behind your walls. Even with a perfect plan, it’s smart to expect a renovation to run at least a bit longer than the shortest estimate you get. Most folks who renovate say they wish they’d padded their expectations by a few weeks—just to keep their sanity.

What Decides the Speed of Renovation?

So, what really speeds up or drags out a house remodel? There’s more to it than just how handy your contractor is. Deadlines get tossed out the window for all sorts of reasons—some you can control, some you can’t.

  • Permits and Inspections: Waiting on city paperwork is like watching paint dry. It can take a few days or stretch to a month if your area is backed up. Some cities, like Los Angeles, are notorious for three-week permit waits on big jobs.
  • Scope of Work: Swapping out a faucet is a one-day job. Knocking out walls or changing layouts? That’s at least weeks, not days.
  • Contractor Crew Size: A bigger, experienced team moves faster. A solo guy juggling projects or friends-of-a-friend crew usually means more delays.
  • Material Wait Times: That tile you picked out? If it's backordered from Italy, get ready to pause the project for weeks.
  • Change Orders: The moment you decide halfway in to switch out the kitchen cabinets, add three to ten more days—easy.
  • House Age and Surprises: Older homes love to spring hidden problems—mold, rotted wood, bad wiring—so always budget extra time.
"The most common cause of renovation delays is waiting for materials and inspections. If you can line these up in advance, you’ll save weeks," says Mike Holmes, veteran contractor and HGTV host.

Here’s a closer look at how some big factors compare for typical house renovation jobs:

FactorImpact on TimelineTypical Delay
Permit ApprovalHigh2-30 days
Materials DeliveryHigh7-60 days
Weather (if exterior work)Medium2-14 days
Required Hidden RepairsHigh3-21 days
Specialty Contractor ScheduleMedium5-15 days

This is why planning everything up front—permits, materials, crew—makes such a difference. Leaving things to chance means you could be camping out in your own basement until Thanksgiving.

Step-by-Step: Typical Renovation Phases

If you want to plan your house renovation timeline, knowing the order of what actually happens can keep you from feeling lost. No matter if you’re fixing up a small condo or a two-story family home, the phases pretty much follow the same path. Here’s what most projects look like:

  1. Planning and Design. This is where you figure out what you want and need. Think about layout changes, style, and your budget. It can take anywhere from a few days with basic updates to several weeks if architects or engineers get involved. Finalizing the design early means fewer last-minute changes later.
  2. Permits and Approvals. If you’re not moving walls or adding major systems, you might skip this. But big jobs need permits from your local city or county, which can easily add a few days to a couple of months. Some cities are super slow. Always ask your contractor who is handling permits so nothing falls through the cracks.
  3. Demolition. This is the fun (and loud) part. Workers tear out whatever is being replaced. For one room, demo can be done in a day. For a big house, you might be looking at up to a week or more.
  4. Structural Work and Systems. Now’s the time to fix framing, electrical, plumbing, and HVAC before walls get closed up. Inspections slow this phase down because work has to pause until the city signs off. Expect anywhere from a few days to several weeks for everything to get done, inspected, and approved.
  5. Putting It Back Together. This is when drywall goes up, floors get finished, cabinets are set, and paint flies. Details matter here—a crooked wall or missing outlet can add days. The finish work can be fast or drag on, depending on how many rooms you’re doing.
  6. Final Touches and Inspections. Punch lists are the final step. That’s where you spot little problems, like a cabinet door not shutting right or a wall with a weird paint patch. Contractors fix these, inspectors might stop by one last time, and you’re finally done.

One more thing—if you’re living in the house during the process, everything will probably take longer. Crews have to work around your stuff and your schedule. If you can crash somewhere else, you’ll save a chunk of time and a lot of headaches.

House Size and Scope Matter (More Than You Think)

House Size and Scope Matter (More Than You Think)

You wouldn’t ask how long a road trip takes without knowing where you’re starting and ending. Same goes for house renovations. The size of your place and what you plan to do are probably the two biggest things that mess with your timeline.

Let’s talk square footage. A small condo or townhouse (think under 1,200 square feet) could see a total cosmetic makeover—paint, floors, fixtures—in as little as two to three weeks, sometimes faster if contractors aren’t juggling a bunch of jobs. But a family-size home (around 2,000 to 3,000 square feet) with several rooms and bathrooms can push that to two or three months, and that’s just for moderate work.

If you’re gutting the whole house or doing a ‘down-to-the-studs’ remodel, expect at least four to eight months. That’s not exaggerating. Bigger projects mean more walls to paint, more floors to lay, and way more stuff that can go sideways, like hidden water damage or squirrel-chewed wiring. And if you own an old house? Add some extra weeks for surprises—old houses love hiding problems in the walls or crawl space.

It’s not just about the house size—scope is the other huge factor. Are you only swapping out cabinets and slapping on new countertops in the kitchen? That’s weeks, not months. If you’re changing layouts, knocking down walls, or moving plumbing, the schedule explodes. Every extra phase—electrical, plumbing, inspections, or even just waiting for permits—piles on days or weeks.

  • Small updates (paint, trim, fixtures): usually 1-3 weeks
  • Kitchen or bathroom remodel: typically 2-8 weeks per room
  • Whole-house cosmetic upgrades: 2-3 months
  • Major structural and system changes: 4-8 months minimum

Here’s a tip—don’t try to shortcut the planning part. The more clear and specific your scope, the fewer time-eating surprises later. Your house renovation timeline depends just as much on what you want as on the number of square feet you have to cover.

Fast-Track Tips: How to Shave Off Days

No one wants their house renovation to drag out any longer than it has to. The good news? You can actually take steps to cut down the days—sometimes by weeks. Here’s how the smartest homeowners and contractors keep things moving.

  • Plan before you swing a hammer. Having every detail picked out—right down to your doorknobs—means no stopping to make choices in the middle of the job. One study found that 38% of renovation delays in the U.S. came from last-minute decision changes.
  • Order materials early. Don’t wait for drywall to go up before ordering cabinets or tile. As of 2024, some specialty fixtures can take 6–12 weeks to arrive. If materials are ready and waiting, crews won’t have to stop and wait.
  • Get your permits lined up. Many cities can take two weeks (or more) just to approve a bathroom remodel permit. If you skip this step or do it last minute, you can count on a long, boring pause.
  • Keep a tight schedule with your trades. Lining up your electrician, plumber, and painter so one finishes as another starts shaves days off. Use a shared calendar or app so everyone knows what’s next.
  • Stick to the original plan. Changing layouts or finishes mid-reno is a surefire way to add days—sometimes even months. Get clear on what you want upfront.

Check out the table below with real numbers to see how much time you could save if you follow these tips:

ActionDays Saved (Avg.)
Planning all details upfront7–21
Ordering materials ahead of schedule10–30
Securing permits before demo7–20
Scheduling overlapping trades5–15
Sticking to original design5–25

Stack a couple of those together and you’re looking at serious time savings. The trick is staying organized, communicating with your crew, and avoiding the urge to change your mind every other week. Most pros will tell you—if you want the job done fast, be decisive and keep everyone in the loop.

Real Stories: What Actually Happens

If you search for real-life examples, you’ll see just how much the actual timeline can zigzag. Take Mark and Kelly from Seattle. They planned for a 45-day kitchen and bathroom overhaul. Three weeks in, they hit a wall—literally. Their contractor found water damage inside the walls that nobody saw in the inspection. Cue the phone calls, insurance claims, and bringing in extra pros. Their quick project stretched to 83 days. The lesson? Hidden problems inside old houses are the biggest wild card.

Or look at the Patel family in Austin. They went for a smaller-scale cosmetic update: repainting, reflooring, and swapping light fixtures. Because they worked with a contractor that let them schedule work in phases, it only took them 16 days. They avoided a ton of headache just by getting materials lined up early and checking that every little detail—yes, even cabinet handles—was in stock before demo started.

And then there’s the full-gut stories. Like Jen, who bought a hundred-year-old Chicago bungalow. She figured six months tops. Turns out, older homes tend to have outdated wiring and plumbing lurking in the walls. The city permits alone ate up five weeks, and when her original flooring order got delayed, she waited another 17 days. Altogether, the house renovation dragged out almost a year. But she swears the wait was worth it now that the place has modern comforts without losing old-school charm.

  • If your house is newer and you’ve lined up materials ahead of time, you stand a better chance of hitting your target timeline.
  • Expect something to take longer than planned if you’re dealing with vintage homes or big layout changes.
  • Always build in a time buffer—try for 20% longer than your best guess. Most pros do this for a reason.

The biggest takeaway? Even the best-laid plans need wiggle room. Real stories show just how quickly small hiccups can snowball. You’ll never regret being extra prepared and asking contractors for step-by-step updates—because surprises are way more common than on HGTV.